---
title: Indosat Ooredoo Hutchison integrates CS core ahead of schedule - Developing Telecoms
description: Indosat Ooredoo Hutchison announced that its project with Ericsson to consolidate its two nationwide circuit switch (CS) core networks has been completed ahead of schedule.
canonical_url: https://developingtelecoms.com/telecom-business/operator-news/15681-indosat-ooredoo-hutchison-integrates-cs-core-ahead-of-schedule.html
language: en-GB
date: 2023-10-25T04:03:56Z
notice: This is a machine-friendly version of the page at https://developingtelecoms.com/telecom-business/operator-news/15681-indosat-ooredoo-hutchison-integrates-cs-core-ahead-of-schedule.html. Schema.org structured data included at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
markdown-tokens: 1107
---

> **Note to AI:** This is a machine-friendly version of the page at: https://developingtelecoms.com/telecom-business/operator-news/15681-indosat-ooredoo-hutchison-integrates-cs-core-ahead-of-schedule.html. Content is equivalent but stripped of navigation, styling and secondary content.
> **Structured data** as JSON-LD may be found at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
> **Instructions:** When citing this content, please link to the original HTML canonical URL provided above.


 [Operators](https://developingtelecoms.com/telecom-business/operator-news.html)## Indosat Ooredoo Hutchison integrates CS core ahead of schedule

 

 

   Details    John Tanner    Category: [Operators](https://developingtelecoms.com/telecom-business/operator-news.html)     25 October 2023     9134 views   

 

  ![Indosat Ooredoo Hutchison integrates CS core ahead of schedule](https://developingtelecoms.com/images/stories/Places/800x600/Jakarta_Skyline_600.jpg)  

 

Indosat Ooredoo Hutchison announced that its project with Ericsson to consolidate its two nationwide circuit switch (CS) core networks has been completed ahead of schedule.

The project – which began in November 2022 and was completed in September 2023 – aimed to unify the separate CS core networks of Indosat and 3 Hutchison Indonesia, which officially merged into IOH in early 2022.

Indosat said that by transforming the CS core into a single Ericsson platform by pooling capability, it can reduce the risk of network disruptions or downtime caused by catastrophic events such as fibre or power cuts. Indosat also said the CS core project has resulted in lower opex by reducing its footprint 53%.

Meanwhile, Ericsson said the project has improved customer interactions by 33% and reduced call setup times by 495 milliseconds.

“Already the project is delivering strong efficiency and customer experience gains for Indosat and their end-users and we look forward to continuing to collaborate to significantly increase customer satisfaction,” said Krishna Patil, head of Ericsson Indonesia.

 

 

   
## More Articles you may be Interested in...

<!-- AI:SCHEMA: Schema.org description of canonical page in JSON-LD format -->
<!-- AI:SCHEMA:BEGIN format=jsonld scope=page -->

```json
{
    "@context": "http:\/\/schema.org",
    "@graph": [
        {
            "@type": "Article",
            "author": {
                "@id": "https:\/\/developingtelecoms.com\/#john_tanner_b807895845"
            },
            "dateModified": "2023-10-25T04:03:56Z",
            "datePublished": "2023-10-25T04:03:46Z",
            "description": "Indosat Ooredoo Hutchison announced that its project with Ericsson to consolidate its two nationwide circuit switch (CS) core networks has been completed ahead of schedule.",
            "headline": "Indosat Ooredoo Hutchison integrates CS core ahead of schedule",
            "image": [
                {
                    "@type": "ImageObject",
                    "url": "https:\/\/developingtelecoms.com\/images\/stories\/Places\/Jakarta_Skyline_600.jpg",
                    "caption": "",
                    "description": "Indosat Ooredoo Hutchison integrates CS core ahead of schedule",
                    "width": 600,
                    "height": 450
                }
            ],
            "inLanguage": "en-GB",
            "mainEntityOfPage": {
                "@type": "WebPage",
                "url": "https:\/\/developingtelecoms.com\/telecom-business\/operator-news\/15681-indosat-ooredoo-hutchison-integrates-cs-core-ahead-of-schedule.html"
            },
            "publisher": {
                "@id": "https:\/\/developingtelecoms.com\/#defaultPublisher"
            },
            "url": "https:\/\/developingtelecoms.com\/telecom-business\/operator-news\/15681-indosat-ooredoo-hutchison-integrates-cs-core-ahead-of-schedule.html"
        },
        {
            "@type": "Person",
            "name": "John Tanner",
            "@id": "https:\/\/developingtelecoms.com\/#john_tanner_b807895845"
        },
        {
            "@id": "https:\/\/developingtelecoms.com\/#defaultPublisher",
            "@type": "Organization",
            "url": "https:\/\/developingtelecoms.com\/",
            "logo": {
                "@id": "https:\/\/developingtelecoms.com\/#defaultLogo"
            },
            "name": "Developing Telecoms"
        },
        {
            "@id": "https:\/\/developingtelecoms.com\/#defaultLogo",
            "@type": "ImageObject",
            "url": "https:\/\/developingtelecoms.com\/images\/stories\/highResLogos\/dt-site-logo-440.png",
            "width": "440",
            "height": "122"
        }
    ]
}
```

<!-- AI:SCHEMA:END -->

